POTHOLE AND ROAD RESURFACING WORK
Highway Maintenance Programme University Ward
It is proposed to commence the resurfacing works to the carrigeways as from Moday the 23rd August.
It is hoped that the works will be carried out with the minimum of inconvenience to the residents. However, the carrigeways will be resurfaced in section to assist those residents who only have one entrance into their properties. There will be leaflets despatched to let residents know when the works will commence.
If you should encounter any difficulties during the phased works, please do not hesitate to contact the council on the following telephone number: 01642 728166 or you can call Councillor Habib Rehman on tel: 01642 644396.
Do you want to tell us what the condition is of your road? Are there any potholes that you want the council to look at and repair or maybe resurface the whole road?
You can also contact Councillor Habib Rehman with your thoughts and views on 01642 644396 or email: habib_rehman@middlesbrough.gov.uk
You can use this form to give us your feedback.
Contact Us
Please can you spare a few minutes to complete this questionnaire. This will help the council to provide the correct level and standard of service and deal with any issues.
Please click the pdf below to download the form.
|
DOC180810uni ward.pdf Size : 0.055 Kb Type : pdf |
